
Q00110 Rev A 8/06
Page 64 of 225
"Note: Copies are uncontrolled documents - For revision verification see the Master Documentation List"
STEPS:
1.
Connect the AC power cable to an active wall outlet, and connect the DC power cable between
the power supply and the 2-Bay Battery Charger
2.
Insert the battery pack into the LEFT bay of the 2-Bay Battery Charger (Note: Only the LEFT
bay performs “Recalibration”)
3.
Press the “Recalibrate” button on the 2-Bay Battery Charger
4.
During the “Recalibrate” process, the left status LED flashes ORANGE. Once the
“Recalibrate” process is completed, this same LED will intermittently flash between ORANGE
and GREEN.
NOTE: - The “Recalibrate” process may require 14 hours to fully complete
- The battery pack should NOT be removed prior to completion of the “Recalibrate” process,
as the battery will be at an unknown level of charge
5.6.8.2
Charging Battery Packs
STEPS:
1.
Connect the AC power cable to an active wall outlet, and connect the DC power cable between
the power supply and the 2-Bay Battery Charger
2.
Insert the battery pack into the EITHER bay of the 2-Bay Battery Charger
3.
The charging cycle on the docked battery pack will automatically begin to execute
4.
During the “Charging” process, the corresponding status LED flashes GREEN. Once the
“Charging” process is completed, this same LED becomes solid GREEN.
NOTE: -
The
“Charging” process, in the two bays of the unit, is performed in a “sequential” fashion. If
two battery packs are docked into the 2-Bay Battery Charger at the same time, the charger
will perform the complete charging sequence on one battery pack, before starting the
charging sequence on the second battery.
Содержание Z.ONE
Страница 1: ......