Connecting the Cables
82
4.17
Post-Installation Checklist
After completing the installation, check the items in the following table to make sure that the
inverter has been safely and correctly installed.
Items
Check Point
Result
Installation
Location/Power
I/O Verification
Is the installation location appropriate?
Does the environment meet the inverter’s operating conditions?
Does the power source match the inverter’s rated input?
Is the inverter’s rated output sufficient to supply the equipment?
(Certain circumstances will result in degraded performance.
Power Terminal
Wiring
Is a circuit breaker installed on the input side of the inverter?
Is the circuit breaker correctly rated?
Are the power source cables correctly connected to the R/S/T terminals
of the inverter?
(Caution: connecting the power source to the U/V/W terminals may
damage the inverter.)
Are the motor output cables connected in the correct phase rotation
(U/V/W)?
(Caution: motors will rotate in the reverse direction if three-phase cables
are not wired in the correct phase rotation.)
Are the cables used in the power terminal connections correctly rated?
Is the inverter grounded correctly?
Are the power terminal screws and the ground terminal screws
tightened to their specified torques?
Are the overload protection circuits installed correctly on the motors (if
multiple motors are run using one inverter)?
Is the inverter separated from the power source by a magnetic
contactor (if a braking resistor is in use)?
Are advanced-phase capacitors, surge protection, and electromagnetic
interference filters installed correctly?
(These devices MUST not be installed on the output side of the inverter.)
Control
Terminal Wiring
Are STP (shielded twisted pair) cables used for control terminal wiring?
Is the shielding of the STP wiring properly grounded?
If 3-wire operation is required, are the multi-function input terminals
Содержание SV-iS7 Series
Страница 17: ......
Страница 22: ...About the Product 5 1 2 2 Interior and Exterior View IP 54 Model Types Less than 22 kW 200 400 V ...
Страница 114: ...Peripheral Devices 97 Group 2 ...
Страница 115: ...Peripheral Devices 98 Group 3 ...
Страница 116: ...Peripheral Devices 99 Group 4 ...
Страница 153: ...Using the Keypad 136 The Parameter Initialization option is displayed again when the initialization is complete ...
Страница 159: ...Basic Functions 142 Code Description V1 Quantizing ...
Страница 465: ...Safety Funtion STO Safe Torque Off 448 14 2 1 Safety Function Wiring Diagram ...