Inject grease until the old grease is pushed
out from the sealing surface of the swing
bearing for each of four directions while
swinging the machine by 90 degrees. The
greasing point is one (grease nipple).
1.
Set the attachment in the greasing position
and then stop the engine.
2.
Before greasing, wipe off the grease
nipples. Replace any damaged nipples
with new ones.
3.
Use the grease gun to apply grease to
the grease nipples.
4.
After applying grease, wipe off old grease
which is pushed out.
No.
Greasing point
Point
s
No.
Greasing point
Point
s
1
Dozer cylinder foot pin
1
3
Dozer foot pin
2
2
Dozer cylinder rod pin
1
4
4.14.7
GREASING SWING BEARING
Do not swing the machine while greasing the swing bearing.
4.14.8
GREASING DOZER
ATTENTION TO GREASING
For the digging work in the water, grease the submerged parts before and after the work every day.
Grease the machine before the work if it has not been used for one month or longer.
[
4. INSPECTION AND MAINTENANCE
]
4-53
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2PX00051ZE03] [0731CsCshWbYs]