1.
Clean each pin and pin bore and grease
sufficiently.
2.
Move the bucket cylinder to align the pin
bores of bucket (6) and bucket link (8) with
each other, and then insert pin (4).
3.
Raise the boom and slightly raise the
bucket from the ground.
4.
Move arm (7) to align the pin bores of
bucket (6) and arm (7) with each other,
and then insert pin (5).
5.
Insert pin (3) and install retaining ring (2).
Fit O-ring (1) in place.
6.
Apply grease to the grease nipples for
each pin until the grease comes out
through the gap between pins and bore.
INSTALLING BUCKET
If O-ring (1) is cracked or has lost elasticity, replace it with a new one.
[
4. INSPECTION AND MAINTENANCE
]
4-24
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2PX00051ZE03] [0731CsCshWbYs]