1.
Set the attachment in the greasing position
and then stop the engine.
2.
Before greasing, wipe off the grease
nipples. Replace any damaged nipples
with new ones.
3.
Use the grease gun to apply grease to
the grease nipples.
4.
After applying grease, wipe off old grease
which is pushed out.
No.
Greasing point
Point
s
No.
Greasing point
Point
s
1
Boom foot pin
1
9
Idler link pin
2
2
Boom cylinder foot pin
1
10
Arm and idler link connecting pin
1
3
Boom cylinder rod pin
1
11
Bucket link pin
1
4
Arm cylinder foot pin
1
12
Arm and bucket connecting pin
1
5
Arm cylinder rod pin
1
13
Swing cylinder foot pin
1
6
Boom and arm connecting pin
1
14
Swing cylinder rod pin
1
7
Bucket cylinder foot pin
1
15
Swing bracket and frame connecting pin
2
8
Bucket cylinder rod pin
1
4.12.6
GREASING ATTACHMENT
ATTENTION TO GREASING
For a new machine, grease the greasing points of the attachment every 8 hours during the first 50
hours of operation.
After that, grease them every 50 hours.
For the work with a special attachment, grease it before work every day.
For the digging work in the water, grease the submerged parts before and after the work every day.
Grease the machine before the work if it has not been used for one month or longer.
[
4. INSPECTION AND MAINTENANCE
]
4-38
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2PX00051ZE03] [0731CsCshWbYs]