BHL Pattern
Left control lever
(1)Swing right
(2)Swing left
(3)Boom down
(4)Boom up
N (Neutral): Upper structure and boom are
held in the position where they are.
Right control lever
(5)Arm out
(6)Arm in
(7)Bucket in
(8)Bucket out
N (Neutral): Arm and bucket are held in the
position where they are.
2
The operations of the boom and arm are different between the ISO and BHL patterns.
For how to switch the rotary multi-control valve (ISO/BHL), see Chapter 3 "MACHINE OPERATION".
For how to switch the rotary multi-control valve, see Chapter 8 "OPTIONAL EQUIPMENT".
[
2. MACHINE FAMILIARIZATION
]
2-15
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2PX00051ZE03] [0731CsCshWbYs]