1.
For more efficient loading work, place the
dump truck where the operator can easily
view it and the swing angle is smaller.
2.
It is easier to load more soil onto the
dump truck from the front side of the back
than from the side.
To improve the efficiency, attach a bucket
suitable for trenching and place the crawlers
parallel to the trench to dig. When digging a
wide trench, dig both sides of it first and dig
the center last.
1.
For backfilling and leveling work after
digging, use the dozer.
2.
Scrape the embankment from the top or
side surface. If the load on the machine is
too much, adjust the dozer height by
using the dozer control lever to move the
dozer up and down.
In addition, you can use the machine for a wider range of purposes by using various optional
attachments.
For replacement of the bucket, see "WHEN REQUIRED" in Chapter 4.
3.10.2
LOADING WORK
3.10.3
TRENCHING WORK
3.10.4
DOZING WORK
[
3. MACHINE OPERATION
]
3-32
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2PX00051ZE03] [0731CsCshWbYs]