Chapter 8 Logic Instructions
8-197
8_
Output Update Timing Chart
E nable
Ope n
Va lid
L in kO pened
Cas e1
P hys ica lL in kE rro r
Cas e2
Cas e3
Ca se4
Ca se5
Case 1 When
Enable
changes from FALSE to TRUE,
Valid
changes to TRUE. When
Open
changes
from FALSE to TRUE,
LinkOpened
changes to TRUE. When
Open
changes from TRUE to
FALSE,
LinkOpened
changes FALSE. When
Enable
changes from TRUE to FALSE,
Valid
changes to FALSE.
Case 2 When
Enable
changes to FALSE,
Open
changes to TRUE and at the moment, the outputs of
the instruction do not change. When
Enable
changes from FALSE to TRUE,
Valid
and
LinkOpened
change to TRUE. When
Open
changes to FALSE,
LinkOpened
changes to FALSE.
When
Enable
changes from TRUE to FALSE,
Valid
changes to FALSE.
Case 3 When
Enable
changes to TRUE,
Valid
changes to TRUE. When
Open
changes from FALSE to
TRUE,
LinkOpened
changes to TRUE. When
Enable
changes from TRUE to FALSE,
Valid
and
LinkOpened
change to FALSE. Afterwards, changing
Open
from TRUE to FALSE will not affect
the output result.
Case 4 When
Enable
changes from FALSE to TRUE,
Valid
changes to TRUE. If there is a problem in
the link to LAN2 of the motion controller at the moment,
PhysicalLinkError
changes to TRUE if
Open
changes to TRUE;
PhysicalLinkError
does not change to FALSE if
Open
changes to
FALSE and
Valid
and
PhysicalLinkError
changes to FALSE simultaneously if
Enable
changes
from TRUE to FALSE.
Case 5 If the link to LAN2 of the motion controller is disconnected during the instruction execution,
PhysicalLinkError
changes to TRUE and meanwhile
LinkOpened
changes to FALSE. When the
link to LAN2 of the motion controller is restored,
PhysicalLinkError
changes to FALSE and
meanwhile
LinkOpended
changes to TRUE.
Function
ETH_Link_Manage is used to start the MODBUS TCP communication. The firmware of V1.01 and
above supports the function.
1. After the input
Enable
of ETH_Link_Manage changes to TRUE and
Open
is set to TRUE, the
MODBUS TCP data start being sent if the physical Ethernet interface of the PLC is connected normally.
As
Open
changes from TRUE to FALSE, the PLC stops sending the MODBUS TCP data.
2. If
Enable
is set to FALSE during the instruction execution, the outputs of ETH_Link_Manage all
change to FALSE. But the PLC will not stop sending the MODBUS TCP data. The link will not be
closed until
Open
is set to FALSE only as
Enable
is TRUE.
3. The error message from the slave or communication timeout has no impact on the instruction
execution.
Содержание DVP-15MC Series
Страница 16: ...1 1 1 Preface Table of Contents 1 1 Explanation of Symbols in This Manual 1 2 1 2 Revision History 1 3...
Страница 19: ...DVP 15MC Series Motion Controller Operation Manual 1 4 _1 MEMO...
Страница 20: ...2 1 2 Overview Table of Contents 2 1 Product Description 2 2 2 2 Functions 2 2 2 3 Profile and Components 2 3...
Страница 23: ...DVP 15MC Series Operation Manual 2 4 _2 MEMO...
Страница 31: ...DVP 15MC Series Motion Controller Operation Manual 3 8 _3 MEMO...
Страница 75: ...DVP 15MC Series Motion Controller Operation Manual 6 26 _6 MEMO...
Страница 87: ...DVP 15MC Series Motion Controller Operation Manual 7 12 _7 MEMO...
Страница 432: ...Chapter 8 Logic Instructions 8 345 8_ MEMO...
Страница 433: ...9 1 9 Chapter 9 Introductions of Axis Parameters Table of Contents 9 1 Description of Axis Parameters 9 2...
Страница 470: ...DVP 15MC Series Motion Controller Operation Manual 10 34 10 MEMO...
Страница 878: ...DVP 15MC Series Motion Controller Operation Manual 11 408 11 1 MEMO...
Страница 920: ...DVP 15MC Series Motion Controller Operation Manual A 16 A MEMO...
Страница 941: ...D 1 D Explanation of Homing Modes Table of Contents D 1 Explanation of Homing Modes D 2...
Страница 966: ...DVP 15MC Series Motion Controller Operation Manual D 26 D MEMO...