Operation manual - EN
www.atmos.eu
EN - 130
ACD03/04
Example of the installation of the external boiler (EK) connected in front of the heating
circuits (distributor)
M
M
MK1
MK2
VF1
VF2
AF
WF
Max. 50°C
ATMOS
ACD
2 - 6 bar
10 – 15 °C
ARU30
ARU10
ARU5
22,5 °c
DKP
MKP2
MKP1
M
EKF
EK
EKS
M
M
MK1
MK2
VF1
VF2
AF
WF
Max. 50°C
ATMOS
ACD
2 - 6 bar
10 – 15 °C
ARU30
ARU10
ARU5
22,5 °c
DKP
MKP2
MKP1
M
EKF
EK
PF
EKS
Each of the circuits (1, 2, 3, 4) will issue requirement for the operation of the EK external
boiler. Circuits are enabled (started) according to the standard logic, i.e. the temperature
of the WF boiler (connection without the accumulation tank) or the PF accumulation tank
temperature (connection with the accumulation tank) and when the condition
→
P04
Sources
parameter (reaching the EKstart minimum temperature) is met.
INFO
- The method of connecting the EK external boiler, the EKP pump and the
EKS
switching valve
is defined in
→
P28
Heating circuit
Parameter.
10. Setting menu - Hydraulics
/F
unction configuration/Sources
Содержание ACD 03
Страница 1: ...Operation manual EN www atmos eu EN 1 ACD03 04 Operation manual ...
Страница 2: ...Operation manual EN www atmos eu ACD03 04 ...
Страница 8: ...Operation manual EN www atmos eu EN 8 ACD03 04 ...
Страница 265: ...Operation manual EN www atmos eu EN 265 ACD03 04 12 Overview of menus and their parameters ...