ATLAS 550 System Manual
Affidavit for Connection Of Customer Premises Equipment
61200305L2-1B
© 2004 ADTRAN, Inc.
9
Affidavit for Connection Of Customer Premises Equipment
to 1.544 Mbps And/or Subrate Digital Services
For the work to be performed in the certified territory of ___________________(telco name)
State of ________________
County of ________________
I, _______________________ (name), _____________________________(business address),
____________________ (telephone number) being duly sworn, state:
I have responsibility for the operation and maintenance of the terminal equipment to be connected
to 1.544 Mbps and/or ________ subrate digital services. The terminal equipment to be connected
complies with Part 68 of the FCC rules except for the encoded analog content and billing protection
specifications. With respect to encoded analog content and billing protection:
( )
I attest that all operations associated with the establishment, maintenance, and adjustment of the
digital CPE with respect to analog content and encoded billing protection information continuously
complies with Part 68 of the FCC Rules and Regulations.
( )
The digital CPE does not transmit digital signals containing encoded analog content or billing
information which is intended to be decoded within the telecommunications network.
( )
The encoded analog content and billing protection is factory set and is not under the control of the
customer.
I attest that the operator(s)/maintainer(s) of the digital CPE responsible for the establishment,
maintenance, and adjustment of the encoded analog content and billing information has (have) been
trained to perform these functions by successfully having completed one of the following (check
appropriate blocks):
( ) A. A training course provided by the manufacturer/grantee of the equipment used to encode analog
signals; or
( ) B. A training course provided by the customer or authorized representative, using training materials
and instructions provided by the manufacturer/grantee of the equipment used to encode analog
signals; or
( ) C. An independent training course (e.g., trade school or technical institution) recognized by the
manufacturer/grantee of the equipment used to encode analog signals; or
( ) D. In lieu of the preceding training requirements, the operator(s)/maintainer(s) is (are) under the
control of a supervisor trained in accordance with _________ (circle one) above.
Содержание ATLAS 550
Страница 16: ...Table of Contents ATLAS 550 System Manual 16 2004 ADTRAN Inc 61200305L2 1B ...
Страница 24: ...Section 1 System Description ATLAS 550 System Manual 24 2004 ADTRAN Inc 61200305L2 1B ...
Страница 62: ...Section 3 Network Turnup Procedure ATLAS 550 System Manual 62 2004 ADTRAN Inc 61200305L2 1B ...
Страница 308: ...Section 4 User Interface Guide ATLAS 550 System Manual 308 2004 ADTRAN Inc 61200305L2 1B ...
Страница 310: ...Section 5 Detail Level Procedures ATLAS 550 System Manual 310 2004 ADTRAN Inc 61200305L2 1B ...
Страница 320: ...Section 5 DLP 4 ATLAS 550 System Manual 320 2004 ADTRAN Inc 61200305L2 1B ...
Страница 326: ...Section 5 DLP 6 ATLAS 550 System Manual 326 2004 ADTRAN Inc 61200305L2 1B ...
Страница 330: ...Section 5 DLP 7 ATLAS 550 System Manual 330 2004 ADTRAN Inc 61200305L2 1B ...
Страница 348: ...Section 5 DLP 14 ATLAS 550 System Manual 348 2004 ADTRAN Inc 61200305L2 1B ...
Страница 351: ...61200305L2 1B 2004 ADTRAN Inc 351 CONFIGURATION GUIDES CFG 1 Dial Backup for Dedicated T1 Circuits 353 ...
Страница 352: ...Section 6 Configuration Guides ATLAS 550 System Manual 352 2004 ADTRAN Inc 61200305L2 1B ...
Страница 364: ...Section 6 CFG 1 ATLAS 550 System Manual 364 2004 ADTRAN Inc 61200305L2 1B ...
Страница 378: ...Section 7 System Event Logging ATLAS 550 System Manual 378 2004 ADTRAN Inc 61200305L2 1B ...
Страница 388: ...Section 8 ADTRAN Utilities ATLAS 550 System Manual 388 2004 ADTRAN Inc 61200305L2 1B ...
Страница 412: ...Section 9 MIBs ATLAS 550 System Manual 412 2004 ADTRAN Inc 61200305L2 1B ...