
6.3.2.5
Setting of masters and followers from TCC600
A minimum of 2 controls are required for the paralleling scheme to work. The Master unit
will be configured first and then the Follower(s).
This procedure requires communication to be established with the target
control (Master or Follower) with Level 2 Access.
Setting up Master Control from TCC600
1.
Verify that the appropriate Setup Settings have been entered for the control
application.
2.
Place the Master Control to be setup in Manual by selecting "Block" from the
Remote Control dialog screen "Remote Operation/Block Auto Control via
Communication (Comm Block)" section.
GUID-53E63F94-8E89-48E6-8C7D-3CB55622B3C2 V1 EN
Figure 341:
Remote Control Dialog Screen
3.
Select Paralleling Type to be "Master/Follower" from the "Paralleling" section of
the "Configuration" dialog screen.
1VAC388793-MB A
Section 6
Configuration
TCC300
417
User Manual
Содержание TCC300
Страница 1: ...Digital Tapchanger Control TCC300 User Manual ...
Страница 2: ......
Страница 3: ...Document ID 1VAC388793 MB Issued 2016 08 10 Revision A Copyright 2016 ABB All rights reserved ...
Страница 22: ...Updating data file remotely 700 Section 16 Glossary 705 Table of contents 16 TCC300 User Manual ...
Страница 26: ...20 ...
Страница 34: ...28 ...
Страница 91: ...1VAC388793 MB A Section 3 Operation TCC300 85 User Manual ...
Страница 126: ...120 ...
Страница 176: ...Section 4 1VAC388793 MB A TCC600 170 TCC300 User Manual ...
Страница 260: ...254 ...
Страница 328: ...322 ...
Страница 494: ...488 ...
Страница 556: ...550 ...
Страница 580: ...574 ...
Страница 600: ...594 ...
Страница 700: ...694 ...
Страница 710: ...704 ...
Страница 712: ...706 ...
Страница 713: ...707 ...
Страница 714: ......
Страница 715: ......