Example 1.
The sequence is implemented by two shots which have the same reclosing time for all
protection functions, namely I>>, I> and Io>. The initiation of the shots is done by
activating the operating signals of the protection functions.
A070887 V1 EN
Figure 343:
Autoreclosing sequence with two shots
t
HSAR
Time delay of high-speed autoreclosing, here:
First reclose time
t
DAR
Time delay of delayed autoreclosing, here:
Second reclose time
t
Protection
Operating time for the protection stage to clear the fault
t
CB_O
Operating time for opening the circuit breaker
t
CB_C
Operating time for closing the circuit breaker
In this case, the sequence needs two CBBs. The reclosing times for shot 1 and shot 2
are different, but each protection function initiates the same sequence. The CBB
sequence is described in Table
Shot 1
(CBB1)
0.3s
Shot 2
(CBB2)
15.0s
INIT_1 (I>>)
INIT_2 (I>)
INIT_3 (Io>)
Lockout
Lockout
Lockout
A071270 V2 EN
Figure 344:
Two shots with three initiation lines
1MRS758755 A
Section 9
Control functions
REC615 and RER615
655
Technical Manual
Содержание RELION Series
Страница 1: ... RELION PRODUCT FAMILY Grid Automation REC615 and RER615 Technical Manual ...
Страница 2: ......
Страница 30: ...24 ...
Страница 50: ...44 ...
Страница 189: ...3 18 5 Settings 1MRS758755 A Section 3 Basic functions REC615 and RER615 183 Technical Manual ...
Страница 206: ...200 ...
Страница 514: ...508 ...
Страница 714: ...708 ...
Страница 786: ...780 ...
Страница 796: ...790 ...
Страница 798: ...792 ...
Страница 803: ...797 ...