DiPro 1500 Installation
DiPro 1500 User Manual
16
Ch 2
1092000
An installation tip
Here is a tip for learning how to use DiPro before you install it. Hook up AC power and
the resolver only. You can do this in an office instead of on the press floor. You can then
use all the menus and make settings. Once you are familiar with the DiPro displays and
keyboard, start the installation. You will be able to get up and running faster.
Installation Guidelines
These guidelines cover major points that are important for proper DiPro operation. By
following these guidelines, you will eliminate problems that could occur later. The points
below are addressed again in the installation procedures.
•
Never run wires for 120V and for lower voltages (such as 24V, 60V) inside
the same conduit. For most presses, you can run your conduit like this. Run
conduit for high voltage lines (120V power, input check circuit, relay
circuits) to the upper right hand corner of the DiPro control enclosure. Run
one or two low voltage conduits into the bottom knockouts for the resolver,
sensor inputs (RCB or WSI), and communications control wires.
•
The AC power supply wires to DiPro 1500 should be run separately from
the DC control wires run to the cam output enclosure containing the relays
for cam channels (if installed). Never use the DiPro power terminals as a
junction point to provide power for devices controlled by the cam switch
relays. In most cases, the AC power supply wires should be connected
directly to the press control transformer at the press control.
•
The communications wiring must not be run with any other wires. These
wires will be installed only if DiPro 1500 is used to send data to the
PACNet
®
pressroom monitoring software computer.
•
Do not use the programmable cam output relay enclosure as a junction
enclosure for all of the AC control wires. Provide a separate junction
enclosure for this purpose.
•
Good grounds at DiPro are important. Make sure DiPro is properly
grounded (see Figure 2-10).
•
The ground wire from DiPro should be connected to the main ground point
of the press control. This may be in the area where the control transformer is
grounded. Finding a good place for a ground is sometimes difficult but it
should be close to where the press receives its ground.
•
All relays and solenoids that are controlled by the cam switch must be
suppressed. Suppressors should be installed across the load and as close to
the load as possible.
Never install the suppressor across the relay contacts.
If a suppressor should fail, it tends to fail shorted. See Figure 2-13.
Summary of Contents for dipro 1500
Page 9: ...Table of Contents DiPro 1500 User Manual vi TOC 1092000 ...
Page 59: ...DiPro 1500 Installation DiPro 1500 User Manual 50 Ch 2 1092000 ...
Page 77: ...Using DiPro 1500 in Initialization mode DiPro 1500 User Manual 68 Ch 4 1092000 ...
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......