62
Optical Wiring
Section 3-3
2.
Attach the clamp to the mounting bracket so that it clamps the cable(s).
Two cables can be attached at the same time.
3.
Remove the Optical Connector Covers from the Unit’s connectors shown
in the following diagram if there are covers protecting the connectors.
Remove the covers from the tips of the cables’ ST connectors if there are
covers protecting the ST connectors.
Note To replace the Optical Connector Cover, just reverse the steps shown
in the diagram above.
4.
Turn the cable connector so that the tab in the connector faces left and
aligns with the slot in the Unit’s connector. Insert the cable connector fully
into the Unit’s optical connector. Press and turn the cable’s connector
clockwise to lock the connector in place.
Mounting bracket
Clamp
1. Screw the mounting
bracket to the Unit.
2. Attach the clamp to the
mounting bracket so that
the cable(s) are clamped.
Optical Connector Cover
Pull off the cover.
Rotate the cover 90
°
counterclockwise.
Summary of Contents for CS1W-CLK12-V1
Page 3: ...iv ...
Page 5: ...vi ...
Page 9: ...x TABLE OF CONTENTS ...
Page 11: ...xii ...
Page 59: ...42 Component Names and Functions Section 3 1 Dimensions Unit mm ...
Page 62: ...45 Component Names and Functions Section 3 1 Dimensions Unit mm ...
Page 91: ...74 CVM1 and CV series Optical Ring Controller Link Units Section 4 2 ...
Page 108: ...91 Setting Data Links Section 5 2 Device Information Setting Data Link Tables ...
Page 125: ...108 Checking Data Link Status Section 5 4 ...
Page 181: ...164 Setting Routing Tables Section 7 4 ...
Page 199: ...182 Memory Areas Related to Duplex Operation Section 8 6 ...
Page 275: ...258 Handling Precautions Section 10 7 ...
Page 298: ...281 CS series Optical Bus Controller Link Units Appendix C Dimensions Unit mm 101 35 130 ...
Page 299: ...282 CS series Optical Bus Controller Link Units Appendix C ...