13 - 24
13. CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
13.4 PLC Side Setting
Parameter setting (when connecting to C
Controller module (Q Series))
Use SW3PVC-CCPU-E Ver.3.05F or later for the CC-
Link utility.
(1) Connection settings
: Necessary : As necessary : Not necessary
*1
If the IP address of the C Controller module (Q Series) has
been changed, input the changed IP address or host name.
*2
If the account of the C Controller module (Q Series) has
been changed, input the changed user name and password.
(2) CC-Link Utility's [Parameter Settings]
(a) Parameter settings
: Necessary : As necessary : Not necessary
*1
When the [Mode] of the CC-Link module is set at [Remote
net - (Ver. 1 mode)], [Remote station points] cannot be set.
*2
Set the same number of occupied stations as that on the
GOT.
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the C Controller
module (Q Series), either turn the C Controller module
(Q Series) OFF and then ON or reset it.
Item
Set value
Setting
necessity at
GOT connection
Target module
*1
192.168.3.3 (Default)
Write authority
Mark the checkbox
User name
*2
target
Password
*2
password
Detailed settings
-
Item
*1
Set value
Setting
necessity at
GOT
connection
Number of modules
1
Target module
1
Start I/O No.
0000
H
Channel No.
(Use default value)
Oper
at
ion sett
ing
s
Type
Master station (fixed)
Mode
Remote net
(Ver.1 mode)
Expanded cyclic setting
Single
Occupied number
Exclusive station 1
Error event: input data
status
Clear
CPU stop: data link status
Refresh
Other settings
(Use default value)
S
ta
tio
n inf
o
rmat
ion set
tin
gs
All connect count
1
Station Type
Sta.
No.1
Intelligent device
station
Occupied number
*2
Sta.
No.1
Exclusive station 1
Reserve/invalid
station select
Sta.
No.1
No setting
Intelligent buffer select
(word)
(Use default value)
Summary of Contents for GT15
Page 2: ......
Page 34: ...A 32 ...
Page 92: ......
Page 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Page 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Page 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Page 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Page 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Page 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Page 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Page 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Page 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Page 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Page 510: ......
Page 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Page 668: ......
Page 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Page 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Page 714: ......
Page 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Page 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Page 762: ......
Page 860: ...REVISIONS 4 ...
Page 863: ......