11 - 22
11. CC-Link IE CONTROLLER NETWORK CONNECTION
11.4 PLC Side Setting
(b) Network range assignment
: Necessary : As necessary : Not necessary
*1
Be sure to set it to perform the cyclic transmission.
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the C Controller
module (Q Series), either turn the C Controller module
(Q Series) OFF and then ON or reset it.
(c) Routing parameter setting
Up to 238 [Transfer Network No.]s can be set.
However, the same transfer network number
cannot be set twice or more (multiple times).
Therefore, the one that can access to other station
from the request source host GOT is 238 kinds of
[Transfer Network No.]s.
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the
request source GOT.
For the setting, refer to the following.
11.3.3 Routing parameter setting
Item
Set value
Setting
necessity at
GOT
connection
Total stations
2
LB/LW
settings (1)
LB
Station
No.1
Start
0000
H
End
00FF
H
Station
No.2
Start
0100
H
End
01FF
H
LW
Station
No.1
Start
00000
H
End
000FF
H
Station
No.2
Start
00100
H
End
001FF
H
LX/LY settings
*1
No setting
Monitoring time
(Use default value)
Specify I/O master station
*1
No setting
Specify reserved station
No setting
Supplementary settings
(Use default value)
Item
Range
Transfer target network No.
1 to 239
Relay network No.
1 to 239
Relay station No.
1 to 120
Summary of Contents for GT15
Page 2: ......
Page 34: ...A 32 ...
Page 92: ......
Page 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Page 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Page 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Page 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Page 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Page 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Page 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Page 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Page 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Page 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Page 510: ......
Page 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Page 668: ......
Page 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Page 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Page 714: ......
Page 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Page 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Page 762: ......
Page 860: ...REVISIONS 4 ...
Page 863: ......