12. CC-Link IE FIELD NETWORK CONNECTION
12.4 PLC Side Setting
12 - 15
9
ME
LSE
C
NE
T
/H
CONN
E
C
TION
(P
LC
T
O
P
L
C NE
T
W
ORK)
10
MELSE
C
N
E
T/10
C
O
NNECTION (P
LC
TO
PL
C
N
E
T
W
O
R
K
)
11
C
C
-L
ink
IE
CO
NT
RO
LLER
NE
TW
ORK
CON
N
E
CTI
O
N
12
CC-Link IE
FIELD
NETWORK
CONNECTION
13
C
C
-L
ink CO
NN
E
C
TI
ON
(INTEL
LI
GEN
T DEVI
CE
ST
AT
IO
N)
14
CC-Lin
k
CONNECTION
(V
ia G4)
15
IN
VER
TER
CONNE
C
T
ION
16
SE
R
V
O AM
P
L
IFI
E
R
CONN
E
C
T
ION
(c) Routing setting
Up to 238 [Target Station Network No.]s can be set.
However, the same target station network number
cannot be set twice or more (multiple times).
Therefore, the one that can access to other station
from the request source host GOT is 238 kinds of
[Target Station Network No.]s.
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the
request source GOT.
For the setting, refer to the following.
11.3.3 Routing parameter setting
GT Designer3 [Communication settings] of
System configuration (Network Type: CC IE
Field)
POINT
POINT
POINT
[Controller Setting] of GT Designer3
For the setting method of [Controller Setting] of GT
Designer3, refer to the following.
11.3.1 Setting communication interface
(Communication settings)
Item
Range
Target Station Network No.
1 to 239
Relay Station Network No.
1 to 239
Relay Station No.
1 to 120
Item
Set value
Network Type
CC IE Field
Network No.
1: Network No.1
Station No.
1: Station No.1
Group No.
0 (fixed)
Mode Setting
Online
Refresh Interval
25ms (Use default value)
Input for Error Station
Clear (Use default value)
Retry
3times (Use default value)
Timeout Time
3sec (Use default value)
Delay Time
0ms (Use default value)
Monitor Speed
High (Normal) (Use default value)
Summary of Contents for GT15
Page 2: ......
Page 34: ...A 32 ...
Page 92: ......
Page 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Page 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Page 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Page 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Page 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Page 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Page 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Page 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Page 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Page 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Page 510: ......
Page 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Page 668: ......
Page 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Page 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Page 714: ......
Page 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Page 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Page 762: ......
Page 860: ...REVISIONS 4 ...
Page 863: ......