3 - 18
3. ACCESS RANGE FOR MONITORING
3.5 Access Range for Monitoring when Connecting FXCPU
Setting method of monitor device
The following example describes the method of setting the network No. and the station numbers when setting
monitor devices .
(1) Monitoring the connected station (host station) and B and W allocated by the link parameter
Specify the host station.
(2) Monitoring devices of other stations
Network No.: 0, Station number: Refer to the following table.
Setting of the station No.
POINT
POINT
POINT
Monitoring link device B or W
For monitoring devices B and W that are allocated by the link parameter, use the host device number even when
designating devices allocated to another station.
Otherwise, the display speed will be reduced.
3.5 Access Range for Monitoring when Connecting
FXCPU
The access range that can be monitored for the direct CPU connection is only the connected CPU. (The GOT cannot
monitor other stations.)
The access range that can be monitored for the Ethernet connection is the host and others.
The access range that can be monitored for the multi-drop communication is only the CPU to which the serial multi-drop
connection unit (GT01-RS4-M) is connected directly.
Station to be accessed
Station
connected to GOT
M
L1
L2
m
L3
1
2
3
M
Host
Other 1
Other 2
Other 3
―
―
―
L1
Other 0
Host
―
―
―
―
―
L2
m
Other 0
―
Host
―
Other 1
Other 2
Other 3
L3
Other 0
―
―
Host
―
―
―
1
―
―
Other 0
―
Host
―
―
2
―
―
Other 0
―
―
Host
―
3
―
―
Other 0
―
―
―
Host
L3
M
L1
GOT
L2
m
2
1
3
Summary of Contents for GT15
Page 2: ......
Page 34: ...A 32 ...
Page 92: ......
Page 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Page 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Page 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Page 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Page 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Page 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Page 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Page 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Page 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Page 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Page 510: ......
Page 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Page 668: ......
Page 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Page 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Page 714: ......
Page 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Page 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Page 762: ......
Page 860: ...REVISIONS 4 ...
Page 863: ......