7. COMPUTER LINK CONNECTION
7.2 System Configuration
7 - 11
1
P
R
EP
ARA
T
OR
Y
P
R
OCEDURES
FOR
MONIT
O
R
ING
2
D
E
VICE RA
NGE
T
H
A
T
CAN
B
E
SET
3
ACCESS
RA
N
G
E
F
O
R MONIT
O
R
ING
4
HOW T
O
MONIT
O
R
REDUNT
ANT
SYS
TEM
5
BUS CONNECTION
6
DIR
E
CT
CONNECTION T
O
CPU
7
COMP
UT
E
R
L
INK
CONNE
C
T
ION
8
E
T
HE
RN
E
T
CONN
E
C
T
ION
7.2.4
Connecting to QCPU (A mode)
*1
For the system configuration on the computer link module side, refer to the following manual.
Computer Link Module (Com. link func./Print. func.) User’s Manual
*2
Connect it to the RS-232 interface (built into GOT). It cannot be mounted on GT1655 and GT155 .
*3
Use the RS-232 connection model.
*4
Use the RS-422 connection model.
Computer
link module
QCPU
(A mode)
GOT
Connection cable
Communication driver
Serial (MELSEC)
PLC
Connection cable
GOT
Number of
connectable
equipment
Model name
Computer link
module
*1
Communication
type
Cable model
Max.
distance
Option device
Model
MELSEC-Q
(A mode)
A1SJ71UC24-R2
A1SJ71C24-R2
A1SJ71UC24-PRF
A1SJ71C24-PRF
RS-232
GT09-C30R2-9P(3m)
or
15m
- (Built into GOT)
1 GOT for 1
computer link
module
GT15-RS2-9P
15m
- (Built into GOT)
*3
A1SJ71UC24-R4
A1SJ71C24-R4
RS-422
500m
- (Built into GOT)
GT09-C30R4-6C(3m)
GT09-C100R4-6C(10m)
GT09-C200R4-6C(20m)
GT09-C300R4-6C(30m)
or
500m
GT16-C02R4-9S
GT15-RS2T4-9P
*2
GT15-RS4-9S
- (Built into GOT)
500m
- (Built into GOT)
*4
Summary of Contents for GT15
Page 2: ......
Page 34: ...A 32 ...
Page 92: ......
Page 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Page 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Page 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Page 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Page 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Page 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Page 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Page 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Page 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Page 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Page 510: ......
Page 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Page 668: ......
Page 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Page 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Page 714: ......
Page 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Page 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Page 762: ......
Page 860: ...REVISIONS 4 ...
Page 863: ......