15 - 34
15. INVERTER CONNECTION
15.5 FREQROL Series Inverter Side Settings
15.5 FREQROL Series Inverter Side Settings
For details of the inverter, refer to the manual of each series.
15.5.1 Connecting FREQROL-S500, S500E, F500J series
Communication settings
Make the communication settings of the inverter.
Be sure to perform the inverter reset after updating each parameter.
(1) Communication port and corresponding parameters
(2) Communication settings of inverter
Set the following parameters using the PU (parameter unit). Set Pr.30 (Extended function selection) to 1 [With
display] before making the parameter settings.
Do not change these parameters, even though they can be monitored from the GOT. If they are changed,
communication with the GOT is disabled.
*1
Setting items are parameter names described in the manual of FREQROL-S500, S500E, and F500J series.
*2
Settings on the GOT can be changed.
When changing the settings on the GOT, be sure to change the parameters on the inverter to correspond with the GOT settings.
*3
Inverter default values (No need to change)
*4
When being monitored from the GOT, the parameter n1 through n7 correspond with Pr.331 through Pr.337, and the parameter
n10 through n12 correspond with Pr.340 through Pr.342.
Numbers in brackets show the parameter number when the parameter unit is in use.
*5
There is no Protocol selection setting on the inverter side.
GOT connection
destination
Parameters corresponding to inverter
RS-485 port
Pr.79, n1 to n7, n10 to n12
Setting item
*1
Parameter No.
*4
Set value
Contents of setting
Communication station number
n1 (331)
0 to 31
Communication speed
*2
n2 (332)
192
*3
19200bps
Stop bit length
*2
n3 (333)
10
Data length: 7bit
Stop bit length: 1bit
Parity check presence/absence
*2
n4 (334)
1
Odd
Number of communication retries
n5 (335)
---
(65535)
The inverter will not come to an
alarm stop.
Communication check time interval
n6 (336)
---
Communication check
suspension
Wait time setting
n7 (337)
0
0ms
CRLF selection
n11 (341)
1
*3
With CR, without LF
Protocol selection
*5
―
―
―
Operation mode selection
Pr.79
0
*3
External operation mode at
power on
Link start mode selection
n10 (340)
1
Computer link operation
E
2
PROM write selection
n12 (342)
0
*3
Written to RAM and EEPROM
Summary of Contents for GT15
Page 2: ......
Page 34: ...A 32 ...
Page 92: ......
Page 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Page 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Page 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Page 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Page 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Page 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Page 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Page 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Page 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Page 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Page 510: ......
Page 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Page 668: ......
Page 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Page 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Page 714: ......
Page 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Page 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Page 762: ......
Page 860: ...REVISIONS 4 ...
Page 863: ......