GOT-F900 SERIES (CONNECTION)
Installation and Wiring of Handy GOT 5
5-3
1
In
tr
o
d
u
c
tio
n
2
Ou
tl
in
e
3
S
p
eci
fic
a
ti
on
s
4
in
st
a
ll
a
ti
o
n
an
d W
iri
ng
o
f
F9
40
G
O
T
5
in
s
ta
llat
io
n
an
d W
ir
in
g
of
Ha
n
d
y
GO
T
6
C
o
nne
c
ti
o
n of
P
e
ri
ph
er
al
Eq
ui
pm
en
t
7
C
o
nn
ect
io
n o
f
T
w
o or
Mor
e
GO
T
U
n
it
s
8
C
o
nn
ec
ti
o
n
of
M
E
LSEC-
F
F
X
Se
ri
e
s
PLC
9
C
o
n
n
e
c
ti
on of
M
E
L
SEC-
A
Se
ri
e
s
PLC
10
C
o
n
n
e
c
ti
on
of
M
E
L
SEC-
Q
n
A
Se
ri
e
s
PLC
Wiring and setting procedures
This section introduces the procedure to connect the Handy GOT to connected equipment such as PLC.
1.
Preparation
2.
Wiring
3.
Setting
Item name
Description
Reference
Outline of Connection
You can learn the outline of the connection method.
5.1
Name of each Part
You can learn the name of each part of the Handy GOT.
5.2
Outside Dimensions and
Installation
You can learn the outside dimensions of the Handy GOT and the
installation method according to the operation type.
5.3
Selection and Installation
of External Cable
You can select cables. This section introduces the procedure to connect
cables to the Handy GOT.
When preparing a cable, you can learn signal names of connectors and
untied wires.
5.4
Processing Panel Face of
Control Box or Cabinet
You can learn the dimension of the processing on the panel face required
to use the Handy GOT with attachment to and removal from the panel face.
This section introduces types of relay cables.
5.5
Pin Layout and Signal
Allocation of Connector
for Serial Communication
and Operation Switches
You can check the signal allocation of connector or untied wires when
preparing a cable.
5.6
Connector Conversion
Box F9GT-HCNB
You can learn the name of each part, installation, and connector
specifications.
5.16
Item name
Description
Reference
Outline of Internal Wiring
You can check block diagrams of portions requiring wiring and the
internal wiring.
5.7
Wiring for 24V DC Power
Supply and Class D
Grounding
You can check the methods to wire the 24V DC power supply and
perform Class D grounding.
5.8
Wiring and Handling of
Operation Switches SW1
to SW4
You can learn how to use and wire the operation switches. (Setting in the
screen creation software is required.)
5.9
Wiring and Handling of
Emergency Stop Switch
(ES1)
You can learn how to use and wire the emergency stop switch.
5.10
Handling of grip switch
(excluding RH model)
You can learn how to use the grip switch.
5.11
Handling of grip switch
(RH model only)
You can learn how to use the grip switch.
5.12
Handling of Keylock
Switch
You can learn how to use the keylock switch (RH model only).
5.13
Item name
Description
Reference
Setting of Connected
Equipment for GOT
Using the screen creation software, you can enable the operation switch
LEDs and the grip switch.
5.14
Summary of Contents for F920GOT-BBD-K-E
Page 4: ...GOT F900 SERIES CONNECTION ii ...
Page 6: ...GOT F900 SERIES CONNECTION iv ...
Page 38: ...GOT F900 SERIES CONNECTION Outline 2 2 10 MEMO ...
Page 70: ...GOT F900 SERIES CONNECTION Specifications 3 3 32 MEMO ...
Page 230: ...GOT F900 SERIES CONNECTION Connection of MELSEC F FX Series PLC 8 8 26 MEMO ...
Page 260: ...GOT F900 SERIES CONNECTION Connection of MELSEC A Series PLC 9 9 30 MEMO ...
Page 290: ...GOT F900 SERIES CONNECTION Connection of MELSEC QnA Series PLC 10 10 30 MEMO ...
Page 322: ...GOT F900 SERIES CONNECTION Connection of MELSEC Q Series PLC 11 11 32 MEMO ...
Page 376: ...GOT F900 SERIES CONNECTION Connection of FREQROL S500 E500 A500 Inverter 13 13 38 MEMO ...
Page 412: ...GOT F900 SERIES CONNECTION Connection of Microcomputer 14 14 36 MEMO ...
Page 554: ...GOT F900 SERIES CONNECTION Connection of Printer 21 21 8 MEMO ...
Page 590: ...GOT F900 SERIES CONNECTION Appendix 23 23 24 MEMO ...
Page 591: ......