
Device Installation
PR 5500 Instrument Manual
EN-28 Sartorius
4.2 Mechanical Preparation
Have all required parts, technical documents and tools at hand for installation.
-
Measurement cables should be kept away from power equipment.
-
Signal cables and measurement cables should be installed separately from electric power lines.
-
It is recommended to lay measurement cables in separate cable conduits.
-
Data cables should be crossed at right angles.
t
t
For the control panel cutout for the device made e.g. in the control cabinet door; see Chapter 3.3.3.
t
t
Install device.
t
t
Secure the cable at the place of installation; e.g., using cable ties.
t
t
Remove the insulation from the cable ends and keep the strands short.
t
t
Connect the screen to device grounding terminal or screen clamping rail; see Chapter 4.2.1.1
t
t
Connect the ground or equipotential bonding conductor to the device grounding terminal; see
Chapter 4.2.1.2.
Summary of Contents for Sartorius Intec Maxxis 4 PR 5500
Page 406: ......