Passport 5-Lead, 5L, LT, XG Service Manual
0070-00-0420
7 - 13
Calibration
Diagnostics and Calibration Procedure
External Loop Test
Data is transmitted to the external communication channel while in the normal operation
mode. Since pins 2 to 3 are shorted, the data is transferred back for reading and
verification.
External Communication Test Specification
Pass
When every character is echoed back correctly
Failed
When any character is echoed back incorrectly
3.
Press the RECORD key to obtain a printout of the test results.
4.
Press the END key to return to the Communications Menu.
7.5.4.3
NIBP Communication Test
Highlight the NIBP Communication Test and press the SELECT key to start the test. The
following test is executed.
Internal Loop Test
The results of the power up internal loop test for the NIBP communication channel on the CPU
Board are displayed. The test consists of putting the NIBP communication channel into loop
mode and transmitting data, and verifying that the correct data is read back.
Summary of Contents for Passport 5-Lead
Page 1: ...Service Manual 5 Lead 5L LT XG Datascope Passport 0070 01 0420 indd 1 4 11 11 4 45 PM...
Page 2: ...5 Lead 5L LT XG Service Manual Datascope Passport 0070 02 0420 indd 1 4 11 11 4 45 PM...
Page 324: ...5 4 0070 00 0420 Passport 5 Lead 5L LT XG Service Manual This page intentionally left blank...
Page 502: ...6 100 0070 00 0420 Passport 5 Lead 5L LT XG Service Manual This page intentionally left blank...
Page 544: ...0070 00 0420 Rev T April 13 2011...