2.1 Preparation Flowchart
17
2
Be sure to read "Operating Precautions" (p. 4) prior to setting up the unit.
Measurement
Preparations
Chapter 2
2.1 Preparation Flowchart
1
Check the power voltage.
See
2.2 "Checking the Power Voltage" (p. 18)
2
Connect the power cord.
See
2.3 "Connecting the Power Cord" (p. 19)
3
Connect the probes or fixture
(option) to the measurement
terminals.
See
2.4 "Connecting the Probes and Fixtures" (p. 20)
4
Turn the power on.
See
2.5 "Turning the Power On and Off" (p. 21)
5
Connect the sample.
Unit Settings and Measurement
See
Chapter 3 "Basic Measurement" (p. 23)
See
Chapter 4 "Compensate for errors" (p. 37)
See
Chapter 6 "Application Functions" (p. 91)
Back
Front
2
3
5
(Example)
Model 9261 Test Fixture
(Option)
4
1
Summary of Contents for 3504-40 C HiTester
Page 2: ......
Page 22: ...1 4 Names and Functions of Parts 16 ...
Page 28: ...2 5 Turning the Power On and Off 22 ...
Page 40: ...3 3 Setting the Measurement Conditions 34 OF UF Evaluation Flow Chart ...
Page 66: ...4 4 Self Calibration 60 ...
Page 96: ...5 2 BIN Measurement Function Model 3504 50 3504 60 only 90 ...
Page 136: ...7 4 About Measurement Times 130 ...
Page 286: ...Appendix 7 Initial Settings Table A14 ...
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......