1.3 Entire Workflow
8
1.3 Entire Workflow
See
3.1 "Pre-Operation Inspection" (p. 23)
Be sure to perform pre-operation inspection prior to measurement.
Check the power voltage.
Connect the power cord.
Connect the probes or fixture (option) to the measurement terminals.
Turn the power on.
Connect the sample.
Prepare the unit, fixture, and sample.
Connect the fixture to the measurement terminals.
Set the measurement conditions.
Connect the sample to the fixture.
Check the measurement results.
Measurement Preparations
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
See
Chapter 2 "Measurement Preparations" (p. 17)
Basic Measurement
See
3.2 "Measurement Example" (p. 24)
Pre-Operation Inspection
Summary of Contents for 3504-40 C HiTester
Page 2: ......
Page 22: ...1 4 Names and Functions of Parts 16 ...
Page 28: ...2 5 Turning the Power On and Off 22 ...
Page 40: ...3 3 Setting the Measurement Conditions 34 OF UF Evaluation Flow Chart ...
Page 66: ...4 4 Self Calibration 60 ...
Page 96: ...5 2 BIN Measurement Function Model 3504 50 3504 60 only 90 ...
Page 136: ...7 4 About Measurement Times 130 ...
Page 286: ...Appendix 7 Initial Settings Table A14 ...
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......