Safety Checklist after first assembly
●
Test intervals of Safety: 6 months
●
Test Component and contents:
1. Removing the reticulated system:
- Check of removing condition each rope
- Screwing the turn buckle and conversion the turnbuckle
in anchors plate(see for this workstep turnbuckle assembly)
2. Abrasion condition of rope:
- Checking of all rope surface
- Strengthened of rope: Coating on the surface
3. Attachment condition of the anchors plate and turnbuckle
4. Screwing condition of all bolt
5. Galvanizing condition of the steel component:
- Protection of steel component from corrosion.
● Measure
In case of the appearance the defect detail is
repaired usually within 3 days after checking.