AIRCRAFT
Landing Gear
DA 42 NG AMM
Page 204
15 Mar 2018
32-40-00
Doc # 7.02.15
Rev. 4
C. Install a Main Wheel
Detail Steps/Work Items
Key Items/References
(1)
Install the wheel:
S
Make sure that the axle is clean.
S
Move the wheel into position on the axle.
S
Install the castle nut. Tighten the castle nut
with 17 - 23 Nm (12 - 17 lbf.ft.) during
turning the wheel. Thereafter untighten it
completely. Repeat fastening with 5 Nm
(3.7 lbf.ft.). Then tighten the wheel nut until
split pin fits into next drillhole.
S
Install the cotter pin.
(2)
Make sure that the wheel turns freely and with
no noise.
No perceptible play in the bearings
allowed.
(3)
Move the caliper into position at the wheel.
Make sure that the mounting spigots engage
with the locating bushes of the torque plate.
Make sure that the pressure plate is
correctly located within the caliper.
(4)
Install the back-plates:
S
Move the back-plates into position at the
caliper.
S
Install the 4 bolts and Washers that attach
the back-plates to the caliper, finger tight.
S
Make sure that the wheel brake disk can
rotate freely between the caliper pressure
plate and the back-plates.
S
Tighten the bolts that attach the back-plates
to the caliper.
Torque according to Cleveland/Parker
Maintenance Manual, latest revision or
placard on caliper.
(4)
Install dust shield.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......