AIRCRAFT
DA 42 NG AMM
Engine Controls
Detail Steps/Work Items
Key Items/References
Doc # 7.02.15
Rev. 4
76-00-00
Page 215
15 Mar 2018
(5)
Install the cable-ties and clamps that attach the
cable harness to the engine and structure.
Refer to the notes that you made during
removal for the type and location of each
attachment.
(6)
Install the shields for the feed-through at the
firewall.
Seal with PR 812 or equivalent.
(7)
Install the engine cowlings.
Refer to Section 71-10 or 71-11.
(8)
Install the access panels in the engine nacelle.
Refer to Section 52-40.
(9)
Connect the main airplane battery.
Refer to Section 24-31.
(10)
Do an engine run up of the engine for which you
replaced the control system electrical harness.
Refer to Section 71-00.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......