DA 42 NG AMM
Page 204
15 Mar 2018
34-10-00
Doc # 7.02.15
Rev. 4
B. Install the Pitot Probe
Detail Steps/Work Items
Key Items/References
(1)
Move the Pitot probe into position at the wing.
(2)
Install the probe onto the access panel:
S
Move the probe into position at the access
panel.
S
Connect the bonding-wire-assembly.
S
Install the bolts, washers and nuts that
attach the probe to the access panel.
Install the bonding-wire-assembly at the
position noted in Paragraph 3 A, step 6.
(3)
Connect the Pitot and static hoses to the probe.
At the positions marked at
Paragraph 3 A, step 5.
(4)
Connect the electrical cables to the probe.
At the in-line connector.
(5)
Install the Pitot probe access panel:
S
Move the panel up into position on the lower
surface of the wing.
S
Install the 3 screws and washers that attach
the access panel to the wing.
Refer to Section 52-40.
(6)
Do a test of the Pitot probe heat system:
S
Set the ELECT. MASTER switch to ON.
S
Reset the PITOT circuit breaker.
S
Set the PITOT switch to ON:
S
The Pitot probe must get warm.
S
Set the PITOT switch to OFF:
S
The Pitot probe must cool down.
S
Set the ELECT. MASTER switch to OFF.
Instrument panel, left side.
Instrument panel, right side.
Instrument panel, left side.
(7)
Do a Pitot leak test.
Refer to Paragraph 5.
(8)
Install a cover with a red pennant onto the Pitot
probe.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......