AIRCRAFT
DA 42 NG AMM
Stabilizers
Detail Steps/Work Items
Key Items/References
Doc # 7.02.15
Rev. 4
55-10-00
Page 205
15 Mar 2018
(8)
Install the lightning protection strip and wire
bonding cable to the trim mounting bracket:
S
Move the lightning protection strip into
position at the elevator trim mount.
S
Move the wire bonding cable into position at
the elevator trim mount.
S
Install the bolt, spacer, washer and nut that
attaches the lightning protection strip and
wire bonding cable to the trim mounting
bracket.
(9)
Connect the 2 fork-end fittings to the trim-tab
cranked actuating levers:
S
Install the 2 bolts, washers and nuts that
attach the fork-end fittings to the trim-tab
actuating levers.
S
Secure the nuts to the bolts with cotter pins.
Under the elevator.
(10)
Do a test for correct, full and free movement of
the elevator control. If necessary, adjust the
elevator control.
Refer to Section 27-30.
(11)
Do a test for correct, full and free movement of
the trim control. If necessary, adjust the trim
control.
Refer to Section 27-38.
(12)
If necessary for your Airworthiness Authority do
a duplicate inspection of the elevator control
system.
(13)
If necessary for your Airworthiness Authority do
a duplicate inspection of the elevator trim
control system.
(14)
Install the horizontal stabilizer fairing:
S
Install the 4 screws that attach the fairing to
the structure.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......