AIRCRAFT
Navigation
DA 42 NG AMM
Page 210
15 Mar 2018
34-50-00
Doc # 7.02.15
Rev. 4
4. Sealant Specification
Use an adhesive bonding compound on the basis of modified polymers or polyurethane to seal the
antennas to the airplane outer surface. Make sure the sealant is free of silicone and it is temperature
resistant from -40 °C ( -40 °F) to +60 °C (+140 °F).
5. Post-Installation Check of the ADF System
A. General
After installing the equipment, check the indicator reading is correct and determine whether or
not quadrantal error correction is necessary. If so, correction should be first carried out on the
ground, then in the air. It is also necessary to establish whether any equipment in the airplane
electrical system is generating interference.
B. Operational Check
Detail Steps/Work Items
Key Items/References
(1)
Locate the airplane on the correction platform
and using the bearing compass point the nose
of the airplane to a radio beacon in boundary
range.
(2)
Switch on the ADF, adjust to the correct
frequency and observe the indication in the
ADF operating mode.
The indicator should read 0 relative
bearing.
(3)
Turn the airplane about its vertical axis to a
larger heading.
The indicator should move to the left.
(4)
Turn the airplane about its vertical axis to a
smaller heading.
The indicator should move to the right.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......