AIRCRAFT
Navigation
DA 42 NG AMM
Page 202
15 Mar 2018
34-41-00
Doc # 7.02.15
Rev. 4
3. Remove/Install the Stormscope Antenna
A. Remove the Stormscope Antenna
Detail Steps/Work Items
Key Items/References
(1)
Remove the horizontal stabilizer fairing.
Refer to Section 55-10.
(2)
Open the WX-500 circuit breaker.
(3)
Remove the screws which attach the stormscope
antenna to the mounting bracket.
Hold the antenna!
(4)
Disconnect the connector of the stormscope
antenna.
(5)
Remove the stormscope antenna from the
horizontal stabilizer.
B. Install the Stormscope Antenna
Detail Steps/Work Items
Key Items/References
(1)
Put the stormscope antenna in position on the
horizontal stabilizer.
The arrow must point into flight
direction.
(2)
Connect the connector of the stormscope
antenna.
(3)
Install the screws which attach the stormscope
antenna to the mounting bracket.
(4)
Close the WX-500 circuit breaker.
(5)
Install the horizontal stabilizer fairing.
Refer to Section 55-10.
(6)
Do a test of the stormscope system.
Refer to Paragraph 4.
4. Test of the Stormscope System
Perform the installation checkout as outlined in Goodrich Stormscope WX-500 Installation Manual
P/N 009-11500-001 Chapter 3 'Installation Checkout'.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......