AIRCRAFT
Landing Gear
DA 42 NG AMM
Detail Steps/Work Items
Key Items/References
Page 242
15 Mar 2018
32-10-00
Doc # 7.02.15
Rev. 4
(4)
Connect the drag strut:
S
Move the drag strut into position.
S
Install the bolt and the washer which
connects the drag strut with the MLG leg.
S
Push the drag lever outward to align the
drag lever with the drag strut.
S
Close the lock hook.
S
Install the bearing shaft.
S
Install the DIN471-20 snap ring which
connects the drag strut and the drag lever.
Refer to Figure 10.
Use a new snap ring.
(5)
Install the nut, spacer and bolt which connect
the latch operating arm with the folding stay.
Refer to Figure 10.
(6)
Remove the foam plastic between MLG leg and
the GFRP of the airplane fuselage.
(7)
Reset the GEAR circuit-breaker.
Right side of instrument panel.
(8)
Bleed the hydraulic system.
Refer to Section 29-10.
(9)
Do a test for the correct operation of the landing
gear retraction and extension system.
Refer to Section 32-30.
(10)
Do a test for the correct pre-load of the main
landing gear door.
Refer to Paragraph 12B.
(11)
Move the wing and rear fuselage trestles clear
of the airplane.
(12)
Lower the airplane.
Refer to Section 07-10.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......