AIRCRAFT
DA 42 NG AMM
Hydraulic Power
Detail Steps/Work Items
Key Items/References
Doc # 7.02.15
Rev. 4
29-10-00
Page 237
15 Mar 2018
(9)
Check opening point of the pump pressure
switch:
S
Extend the landing gear fully.
S
Open dump valve until the pump switches
ON:
S
Remove the lock wire from the dump valve.
S
Loosen the counter nut.
S
Loosen the hexagon socket to open the
dump valve.
S
Slowly close the dump valve so that the
pressure on the manometer increases slowly.
S
Now wait approx. 20 sec so that the
accumulator can charge fully.
S
Slowly
close the dump valve completely and
check the pressure with the manometer:
S
Tighten the hexagon socket to close the
dump valve.
S
Tighten the counter nut.
S
Install the lock wire onto the dump valve.
Refer to Section 32-30.
Adjust the dump valve so that the
circulation pressure is at 110 bar
(1595 PSI).
Set-point: 114 ±1 bar (1653 ± 14.5 PSI).
6 - 10 Nm (4.4 - 7.4 lbf.ft.),
wrench size 1/4 in.
8 Nm (5.9 lbf.ft.), wrench size 19 mm.
(10)
Move the wing and rear fuselage trestles clear of
the airplane.
(11)
Lower the airplane with the jacks.
Make sure that the area around the
airplane is clear.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......