B. Install an Alternate Air Control Forward Inner-Cable
Detail Steps/Work Items
Key Items/References
(1)
Make sure that the alternate air control cable
outer sheath is in good condition and is not
kinked.
(2)
Make sure that the new alternate air valve
forward control cable inner is clean and dry.
(3)
Install the new alternate air valve forward control
cable inner:
S
Attach the end of the length of cord that is in
the control cable outer sheath to the new
control cable inner.
S
Pull the new cable into the outer sheath with
the length of cord.
S
When the new inner cable is fully through the
outer sheath:
S
Disconnect the length of cord from the
inner cable.
At the cockpit end.
From the relay lever end.
(4)
Connect the alternate air forward inner cable to
the operating lever in the cockpit:
S
Install the swivel fitting into the operating
lever.
S
Pass the inner cable through the swivel
fitting and tighten the swivel fitting.
Refer to Figure 2.
(5)
Connect the alternate air inner cable to the relay
lever:
S
Install the swivel fitting into the relay lever.
S
Pass the inner cable through the swivel
fitting and tighten the swivel fitting screw.
Refer to Figure 2.
(6)
Adjust the alternate air cable that you installed.
Refer to Paragraph 6.
(7)
Install the engine cowlings that you removed.
Refer to Section 71-10.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......