AIRCRAFT
Starting
DA 42 NG AMM
Page 208
15 Mar 2018
80-00-00
Doc # 7.02.15
Rev. 4
B. Install an Engine Start Relay
Detail Steps/Work Items
Key Items/References
(1)
Install the starter relay:
S
Move the new relay into position in the relay
panel.
S
Install the 2 washers and bolts that attach
the relay to the relay panel.
(2)
Connect the control cables to the relay.
At the terminal block.
(3)
Connect the airplane main battery.
Refer to Section 24-31.
(4)
Close and secure the front baggage
compartment door.
(5)
Start the related engine and do a test for the
correct operation of the engine starting system.
Refer to Section 71-00.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......