AIRCRAFT
Heating and Ventilation
DA 42 NG AMM
Page 204
15 Mar 2018
21-51-00
Doc # 7.02.15
Rev. 4
B. Install the Central Unit
Detail Steps/Work Items
Key Items/References
(1)
Lift the RACC central unit into the airplane.
(2)
Slide the RACC central unit backward. Make sure
to position the baseplate of the RACC central unit
above the RACC brackets and trailing edge of
the baseplate inside the C-profile.
(3)
Install four bolts which connect the baseplate of
the RACC central unit to the RACC brackets on
LH and RH side of airplane.
(4)
Install the drip tray.
(5)
Install the drain hoses to the RACC central unit:
S
Drip tray drain hose.
S
Evaporator drain hose.
(6)
Connect the electric cables to the RACC central
unit to:
S
2 heavy connectors of the RACC central unit
terminal board (LH).
S
1 plug coming from control panel.
(7)
Install the hot exhaust air duct to the RACC
central unit.
(8)
Install the flexible air hoses to the RACC central
unit:
S
Flexible cold air hose.
S
Flexible hot air hose.
(9)
Install the short baggage extension.
Refer to Section 25-10.
(10)
Install the seatbelt pulleys of the passenger
seats.
Refer to Section 25-10.
If OÄM 42-324 is installed refer to
%
AmSafe Maintenance Documentation.
%
(11)
Install the passenger seats.
Refer to Section 25-10.
(12)
Perform a cooling test of the RACC system.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......