AIRCRAFT
Heating and Ventilation
DA 42 NG AMM
Detail Steps/Work Items
Key Items/References
Page 202
15 Mar 2018
21-51-00
Doc # 7.02.15
Rev. 4
(7)
Remove the drain hoses from the RACC central
unit:
S
Drip tray drain hose.
S
Evaporator drain hose.
(8)
Remove the drip tray.
(9)
Remove the four bolts which connect the base
plate of the RACC central unit to the RACC
brackets on the LH and RH side of airplane.
(10)
Slide the RACC central unit forward.
(11)
Lift the RACC central unit clear of the airplane.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......