AIRCRAFT
Landing Gear
DA 42 NG AMM
Page 208
15 Mar 2018
32-60-00
Doc # 7.02.15
Rev. 4
4. Replace a Nose Gear Folding Stay Switch
Use the following procedure for the nose gear folding stay switch.
A. Replace a Nose Gear Folding Stay Switch
Detail Steps/Work Items
Key Items/References
(1)
Pull the GEAR and GEAR ANNUN/ELEV LIMIT
circuit breakers.
Instrument panel. Right side.
(2)
Locate the switch that you will replace.
Refer to Figure 6.
(3)
Replace the switch:
S
Remove any cable-ties that may secure the
electrical cables for the switch to the
structure.
S
Disconnect the electrical cables for the
switch.
S
Remove the 2 screws and washers that
attach the switch.
S
Move the old switch clear of the mounting.
S
Move the new switch into position.
S
Install the 2 screws and washers that attach
the switch.
S
Reconnect the electrical cables for the
switch.
S
Install the cable-ties that attach the electrical
cables for the switch to the structure.
Note the position of the cable-ties.
At the in-line connector.
At the in-line connector.
At the positions noted.
(4)
Reset the GEAR and GEAR ANNUN/ELEV
LIMIT circuit breakers.
Instrument panel. Right side.
(5)
Do a test of the landing gear position and
warning system.
Refer to Paragraph 5.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......