AIRCRAFT
Equipment/Furnishings
DA 42 NG AMM
Page 204
15 Mar 2018
25-50-00
Doc # 7.02.15
Rev. 4
B. Install the Aft Baggage Compartment
Detail Steps/Work Items
Key Items/References
(1)
Make sure that the rear fuselage is clear of
loose objects.
For example, tools, cleaning cloths or
other hardware.
(2)
Install the aft baggage compartment:
S
Move the baggage compartment into
position at the rear fuselage.
S
Install the flexible air hose on the G1000 box
and attach the worm drive clamp.
S
Move the baggage compartment aft and into
the rear fuselage:
S
Make sure that baggage compartment is
fully into position and install the 4 quick-
release fasteners that attach the baggage
compartment to the fuselage baggage
frame.
Make sure that the aft end of the
baggage compartment locates correctly
in fuselage ring frame 1.
(3)
Install the hinged floor-panel:
S
Move the hinged floor panel into position at
the front of the baggage compartment.
S
Align the 4 quick-release fasteners from the
floor panel in to the baggage compartment
floor and attach.
(4)
Move the floor carpet back into position on the
baggage compartment floor.
(5)
If necessary, install any equipment that you
removed from the baggage compartment and
install the cargo net.
(6)
Move the passenger seat backs into the upright
position.
Make sure that the seat backs are
correctly locked into position.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......