AIRCRAFT
DA 42 NG AMM
Electrical Power
Doc # 7.02.15
Rev. 4
24-60-00
Page 205
15 Mar 2018
B. Install a Circuit Breaker
Detail Steps/Work Items
Key Items/References
(1)
Move the circuit breaker into position in the
instrument panel.
(2)
Move the bus bar back into position with the
remaining circuit breakers.
(3)
Reconnect the electric cables to the circuit
breaker.
Refer to Chapter 92 for the wiring
diagrams.
(4)
Install the screw that attaches the circuit breaker
to the bus bar.
(5)
Install the washers and nuts that attach the
circuit breakers to the instrument panel.
(6)
Install the instrument panel cover.
Refer to Section 25-10.
(7)
Reconnect the main battery and the ECU
backup batteries.
Refer to Section 24-31. Connect the
positive cable first.
(8)
Close and secure the baggage compartment
door.
Refer to Section 52-40.
(9)
Do a test for the correct function of the circuit
breaker:
S
Set the ELECT. MASTER to ON.
S
Operate the electrical system related to the
circuit breaker that you will test.
S
Pull the circuit breaker.
S
Set the circuit breaker.
S
Set the ELECT. MASTER switch to OFF.
Apply the full electrical load to the
system.
The system must stop operating. Make
sure that there is no power to the
system.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......