AIRCRAFT
Landing Gear
DA 42 NG AMM
Detail Steps/Work Items
Key Items/References
Page 206
15 Mar 2018
32-20-00
Doc # 7.02.15
Rev. 4
(9)
Install the two nose gear folding stay switches
and secure the electrical connections with cable
binder.
Refer to Section 32-60.
(10)
Reset the GEAR circuit breaker.
Right side of instrument panel.
(11)
Do a test for the correct operation of the landing
gear retraction and extension system.
(12)
Move the wing and rear fuselage trestles clear
of the airplane.
(13)
Lower the airplane.
Refer to Section 07-10.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......