AIRCRAFT
Equipment/Furnishings
DA 42 NG AMM
Detail Steps/Work Items
Key Items/References
Page 206
15 Mar 2018
25-60-00
Doc # 7.02.15
Rev. 4
(4)
Prepare the new battery pack for installation:
S
Remove the paper backing from the rubber
seal at the connector end of the battery
pack.
S
Lubricate the seal.
Use G GE-635 non-petroleum based
silicone grease or similar.
(5)
Install the new battery pack:
S
Connect the 8 pin connector from the ELT
wiring loom to the connector on the battery
pack.
S
Connect the 2 pin connector from the
battery pack cables to the recessed
connector on the ELT.
S
Move the battery pack into position on the
ELT.
S
Install the 4 screws that attach the battery
pack to the ELT.
Connecting the 2 pin connector will
activate the ELT. Reset the ELT by
setting the ELT ON/OFF switch to ON
then to OFF.
Make sure that none of the electrical
cables are trapped between the mating
surfaces of the ELT and the battery
pack.
(6)
Install the ELT in the airplane mounting and
attach the 'Battery Pack Replacement Date'
label to the top surface of the ELT protective
cover where it can be easily seen.
Refer to Paragraph 2.
(7)
Record the details of the ELT battery pack
replacement date in the airplane log-book.
(8)
Do a functional test of the ELT.
Refer to Paragraph 7.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......