AIRCRAFT
Airworthiness
Limitations
DA 42 NG AMM
Page 6
15 Mar 2018
04-00-00
Doc # 7.02.15
Rev. 4
Before painting the airplane in a different shade than listed above, the manufacturer must be
%
contacted. Special paint schemes can be defined in an approved supplement to this AMM.
%
Only certain areas which are defined in Chapter 51 of this manual (for example, registration
markings, placards and warning markings, trim or striping) may have a different color.
(2) For S/N 42.N300/42.MN100 and above:
%
It is mandatory to paint the DA 42 NG and DA 42 M-NG in accordance with the color paint
%
scheme provided in Section 51-20.
%
Before painting the airplane in a different shade than defined in Section 51-20 of this Manual,
%
the manufacturer must be contacted.
%
D. Repairs
Repairs which are not described in Chapter 51 of this manual may only be carried out in
accordance with a repair scheme which must be approved in accordance with the procedures
established by the competent certifying authority.
E. Replacement of Composite Parts
%
Composite parts made from resin system L285 with part numbers designated only for serial
%
numbers below 42.N300/42.MN100 must not be installed on serial numbers 42.N300/42.MN100
%
and above without further approval.
%
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......