AIRCRAFT
Fire Protection
DA 42 NG AMM
Page 202
15 Mar 2018
26-00-00
Doc # 7.02.15
Rev. 4
B. Install an Engine Overheat Detector
Detail Steps/Work Items
Key Items/References
(1)
Connect the electrical cables for the overheat
detector.
Refer to Figure 2. At the ring terminals.
(2)
Install the overheat detector:
S
Move the overheat detector into position at
the mounting bracket.
S
Lower the overheat detector into the
mounting bracket from the top.
S
Tighten the overheat detector on the
mounting bracket.
S
Secure the overheat detector on the
mounting bracket.
Use a new safety wire.
(3)
Fix the cable with cable ties in the same way as
they were before removal.
(4)
Do a test of the related overheat detector.
Refer to Paragraph 3.
(5)
Install the engine cowlings to the related engine.
Refer to Section 71-10.
3. Overheat Detector Test
Detail Steps/Work Items
Key Items/References
(1)
Set the ELECT. MASTER switch to ON.
In the cockpit.
(2)
Press and hold the TEST button of the landing
gear.
The LH/RH ENG FIRE warning must
appear on the PFD.
(3)
Release the TEST button of the landing gear.
The LH/RH ENG FIRE warning must
disappear from the PFD.
(4)
Set the ELECT. MASTER switch to OFF.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......