AIRCRAFT
DA 42 NG Series
AMM
Ice Protection System
Doc # 7.02.15
Rev. 4
30-00-00
Page 221
15 Mar 2018
B. Install the Low Pressure Switch Proportioning Unit
Detail Steps/Work Items
Key Items/References
(1)
Connect feeder line to the low pressure switch
proportioning unit.
(2)
Secure feeder line connection with locking wire.
(3)
Move low pressure switch proportioning unit in
position in the vertical stabilizer.
To give access to the feeder line of the
fuselage section.
(4)
Install bolts and washers which hold the low
pressure switch proportioning unit to the vertical
stabilizer.
(5)
Connect the two hose connections to the
proportioning unit labeled as 2 and 3 on the
proportioning unit.
(6)
Secure the two hose connections with locking
wire.
CAUTION:
YOU MUST CONNECT THE HOSES TO THE CORRECT PORTS. IF
YOU DO NOT CONNECT THE HOSES CORRECTLY, THE SYSTEM
WILL NOT WORK PROPERLY.
(7)
Connect the hose connections to the low
pressure switches.
Remove caps.
Use new seals.
(8)
Secure the hose connections with locking wire.
(9)
Connect all electrical connectors from the low
pressure switches.
(10)
Connect VOR antenna (coaxial cable).
(11)
Install cable ties.
(12)
Install fairing cover to empennage.
(13)
Carry out operational test.
Refer to Paragraph 2.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......