AIRCRAFT
DA 42 NG AMM
Time Limits and
Maintenance Checks
100 hr items marked * apply to US registered airplanes only
Interval
Inspection Items, RH Engine
100 200 1000 2000 Time Initials
Doc # 7.02.15
Rev. 4
05-28-00
Page 13
15 Mar 2018
14.
Examine the oil breather line.
Refer to the AE Maintenance Manual, latest revision.
X
X
X
X
15.
Examine the propeller control system:
Refer also to mt-Propeller Operation and Installation
manual, latest revision.
S
Examine the hose and hose connection. Look
specially for leakage and damage.
S
Examine the un-feathering pressure accumulator.
Look specially for:
S
Leakage and damage.
S
Insecure attachment.
S
Nitrogen pressure accumulator.
Refer to mt-Propeller Operation and Installation
Manual, latest revision.
S
Check accumulator nitrogen pressure:
S
Set valve under current (open).
S
Remove the cap from the charging valve.
S
Connect a suitable nitrogen supply to the
charging valve and charge the accumulator to
the correct pressure 10.4 bar (150 PSI). Follow
the manufacturer’s instructions for the nitrogen
supply.
S
Disconnect the nitrogen supply.
S
Install the cap onto the charging valve.
X
X
X
X
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......