AIRCRAFT
DA 42 NG AMM
Electrical Power
Doc # 7.02.15
Rev. 4
24-60-00
Page 209
15 Mar 2018
D. Install a Nut-Secured-Type Instrument Panel Switch
Detail Steps/Work Items
Key Items/References
(1)
Move the switch into position near to the switch
electrical cables.
(2)
Connect the electrical cables to the switch.
Refer to Chapter 92 for the wiring
diagrams.
(3)
Move the switch into position in the instrument
panel.
Hold the switch in position.
(4)
Install the washer and nut that attach the switch
to the instrument panel.
(5)
Install the instrument panel cover.
Refer to Section 25-10.
(6)
Reconnect the main battery and ECU backup
batteries.
Refer to Section 24-31. Connect the
positive cable first.
(7)
Close and secure the baggage compartment
door.
Refer to Section 52-40.
(8)
Do a test for the correct function of the switch:
S
Set the ELECT. MASTER to ON.
S
Set the switch that you installed to ON.
S
Set the switch that you installed to OFF.
S
Set the ELECT. MASTER to OFF.
The related system must operate.
The related system must switch off.
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......