AIRCRAFT
DA 42 NG AMM
Navigation
Doc # 7.02.15
Rev. 4
34-10-00
Page 211
15 Mar 2018
D. Pitot Leak Test
Follow the Pitot static leak tester manufacturer’s instructions for the use of the test set. Obey the
safety precautions for Pitot static leak testing at all times.
Detail Steps/Work Items
Key Items/References
(1)
Remove the blanking cap from the Pitot-static
probe and connect the Pitot-static leak tester to
the probe.
Use the test-set adaptor.
(2)
Slowly apply a pressure to the Pitot port that
gives an indication of 150 kts on the ASI.
(3)
Let the pressure stabilize.
(4)
Monitor the system pressure.
The leak rate must not be more than
10 kts/min.
(5)
Compare the test equipment ASI and the
airplane ASI.
The indication error must be less than
shown in Table 2.
(6)
Slowly release the system pressure.
(7)
Disconnect the Pitot static probe adaptor and
install a blanking cap, with pennant, onto the
airplane Pitot-static probe.
Table 2: ASI Indication Error
Airspeed
Permissible Error
160 kts
±4 kts
100 kts
±4 kts
40 kts
±1.7 kts
Summary of Contents for DA 42 NG
Page 933: ...AIRCRAFT DA 42 NG AMM Fuel Doc 7 02 15 Rev 4 28 TITLE Page 1 15 Mar 2018 CHAPTER 28 FUEL ...
Page 1459: ...AIRCRAFT DA 42 NG AMM Lights Doc 7 02 15 Rev 4 33 TITLE Page 1 15 Mar 2018 CHAPTER 33 LIGHTS ...
Page 1711: ...AIRCRAFT DA 42 NG AMM Doors Doc 7 02 15 Rev 4 52 TITLE Page 1 15 Mar 2018 CHAPTER 52 DOORS ...
Page 1853: ...AIRCRAFT DA 42 NG AMM Wings Doc 7 02 15 Rev 4 57 TITLE Page 1 15 Mar 2018 CHAPTER 57 WINGS ...
Page 2071: ...AIRCRAFT DA 42 NG AMM Engine Doc 7 02 15 Rev 4 72 TITLE Page 1 15 Mar 2018 CHAPTER 72 ENGINE ...
Page 2288: ......
Page 2320: ......
Page 2322: ......