ES601-US OPERATING MANUAL
Manual Testing/Chapter 5
#
Page 75
Figure 43
- Switch DUT to "OFF" for "DUT OFF" tests.
Upon pressing
CONTINUE
on the above menu, ES601-US repeats all leakage tests that were enabled by
the user. Since the DUT power switch remains "OFF" for all measurements, ES601-US does not stop when
the AC supply is changed and no further breaks in the sequence occur until the end of the test.
Once the leakage measurement sequence has stepped through all specified test conditions, ES601-US will
stop and display the last measurement taken during the leakage test. Pressing the
CONTINUE
button on
the display copies the leakage measurement results to the temporary data buffer, along with the limits
corresponding to each measurement. Refer to Chapter 2 for a discussion of the leakage current protocols of
ES601-US, and the data which is saved by each protocol.
Summary of Contents for ES601-US
Page 1: ...Operating Manual ES601 US Automated Electrical Safety Analyzer ...
Page 2: ......
Page 4: ......
Page 8: ...Page iv ...
Page 20: ...ES601 US OPERATING MANUAL Definitions Page xvi ...
Page 40: ...ES601 US OPERATING MANUAL Overview Chapter 2 Page 20 ...
Page 58: ...ES601 US OPERATING MANUAL Setup Chapter 3 Page 38 ...
Page 114: ...ES601 US OPERATING MANUAL Manual Testing Chapter 5 Page 94 ...
Page 135: ...ES601 US OPERATING MANUAL Automated Testing Chapter 6 Page 115 ...
Page 162: ...ES601 US OPERATING MANUAL Computer Control Chapter 7 Page 142 ...
Page 216: ...ES601 US OPERATING MANUAL Maintenance Chapter 9 Page 196 ...
Page 234: ...ES601 US OPERATING MANUAL Appendix B Page 214 ...
Page 238: ...ES601 US OPERATING MANUAL Appendix C Page 218 ...
Page 239: ...ES601 US OPERATING MANUAL Appendix D Page 219 APPENDIX D Importing Equipment Records ...
Page 240: ...ES601 US OPERATING MANUAL Appendix D Page 220 ...